103 Vineyard – Project Update Tiling and Drywall Posted bySimon OppligerMarch 28, 2020September 21, 2021Posted inBlog, Featured Almost done with tiling and sheetrock. Gotta love the balance these guys have. Next week…..install wood flooring. Facebook Share Linked In Share